Future Imagery Architecture

From INVESaTWIKI

Future Imagery Architecture (FIA)

The NRO is developing the Future Imagery Architecture (FIA), which will capitalize on available small satellite technology to address the needs of tomorrow's customers in the most effective way possible, responding to an exhaustive study of customer needs. These systems are intended to be increasingly responsive to operational needs and the military is an integral partner and participant in NRO space missions. As the NRO begins this revolutionary research and development (R&D) program and new acquisition efforts for imagery intelligence, military partners are helping shape the next generation of satellites.
The Future Imagery Architecture, which builds the space-borne imagery intelligence capability that is meant to operate for the next several decades, will be an incredible improvement over current systems. The satellites promise to deliver many times the data at a much-reduced interval between pictures. It has the potential to revolutionize the way the United States employs military forces. And it can also greatly complicate the lives of terrorists, drug lords, and weapons proliferators who pose national security challenges.
The NRO formally proposed the Future Imagery Architecture Program in its Fiscal Year 1998 budget submission to Congress on 06 March 1997. The FIA program is predicated on the concept that the NRO would specify performance requirements (such as resolution and revisit rates), with the means by which the requirements are met to be specified by the contractor team. Reportedly FIA is intended to collect between eight and twenty times the volume of imagery as current systems. The FIA program, crafted with NGA, was based on the recommendations of the 1996 Imagery Architecture Study (IAS) team led by Robert Herman, which recommended reducing the size of national intelligence satellites.
The initial "Phase A" architecture study, which detailed the attributes of a future imagery system desired by NRO customers, concluded in mid-1996 under the sponsorship of the NRO and the Central Imagery Office (subsequently merged into NGA). This included the identification of over 20 varying performance levels. The "Phase A" concept demonstrated that a new generation of smaller imagery satellites could be built within budget and with improved capabilities.
The "Phase B" concept definition effort began in May 1996, with the NRO working with six competing contractor teams and NGA to determine the utility of the various increments of improvement in imagery capabilities. NGA contributed by listing the 25-30 attributes of an imagery constellation, such as area, resolution, and accuracy of geospatial information. FIA vendors were free to propose a mixed architecture of government systems and commercial systems.
"Phase C" involves actually building the satellites and operating them. Some 234 representatives from 56 companies attended a classified NRO briefing on Phase C of FIA in January 1997. NRO realised in March 1998 that proposed industry plans exceeded the FIA budget, with NRO calculating that the procurement would cost about 25% more than the industry-submitted estimates. The NRO delayed Phase C of FIA by about six months to resolve the differences between the NRO and contractor estimates of the projected cost of the planned constellation. The launch of the next generation of imagery satellites was slipped until 2004 or 2005, a one-year delay from the original 2003 to 2004 launch goal. As of mid-1998 the NRO officials appeared to be favoring an evolutionary system of three or four imagery satellites, rather than a revolutionary architecture of 10 or 12 spacecraft.
FIA, to be carried out over the next decade or so, will be the most expensive program in the history of the intelligence community. In 1997 and 1998 Congress imposed spending caps on the program to make sure its costs will not overwhelm the limited money that is available for other intelligence work. Despite this imposition of those spending caps, the House Permanent Select Committee on Intelligence remained gravely concerned that the program as currently planned had the potential of being the biggest white elephant in US intelligence history, because there was inadequate funding to task the satellites, process the digital data they collect, exploit the information coming from the data, and then disseminate the information to the national policymaker, the analysts, or the military unit that needs the information. The National Reconnaissance Office was a big beneficiary of a $1.5 billion increase in intelligence spending in the fiscal year 1999 budget. However, Congressional conferees placed a cost cap on the the Future Imagery Architecture.
On 27 April 1999 Raytheon Company was awarded a contract by the NRO to develop and integrate the ground infrastructure portion of the Future Imagery Architecture. This program, known as the Mission Integration and Development (MIND) Program, will extend from 1999 through 2013, plus two one-year options for additional operations and maintenance. A key objective of the MIND team will be to provide the NRO with a state-of-the-art Intelligence Infrastructure as it enters the 21st century - combining numerous space and ground components into one integrated system. This infrastructure will equip intelligence providers and users with effective and timely access to systems and information from NRO mission areas. Raytheon, with support from its teammates Lockheed Martin, SAIC and GDE, will be responsible for the MIND development, total system architecture integration and test, and system operations and maintenance. The contract, awarded to Raytheon Systems Company's Imagery and Geospatial Systems Division, will be performed primarily at its Garland, Texas, and Reston, Va., operations, and at Lockheed Martin's Valley Forge, Pa., and San Jose, Calif., operations.
In early Spring 1999 Director of Central Intelligence George J. Tenet and Deputy Defense Secretary John J. Hamre commercial imagery initiative proposed by NRO Director Keith Hall. The goal of the plan is to satisfy general imagery requirements through commercial vendors, while keeping more advanced imagery systems under government control. In July 1999 the CIA and DOD approved the $1 billion muti-year budget for the initiative, which is part of the Future Imagery Architecture. Half this amount had already been included in the NRO and NGA budgets for 2001 through 2005.
Initially it appeared that "Phase C" would be separated into satellite, integration and ground segments. Previous NRO procurements had been split among satellites, ground hardware and data processing. Six teams were competing for different parts of FIA. Some vendors were bidding on all segments, and theoretically a single contractor could win it all. In all cases, three or more teams were competing for a major component. Boeing, Lockheed Martin and Spectrum Astro were initial bidders for the FIA electro-optical spacecraft. These three companies, along with Orbital Sciences Corp. and Loral, bid on the imaging radar spacecraft. Both Northrop Grumman and TRW (a major imagery satellite subcontractor) were allied exclusively as subcontractors to Lockheed Martin in the FIA bid. Lockheed Martin supplied all of the NRO imaging spacecraft currently in orbit. The Improved CRYSTAL (Advanced KH-11 KENNAN) electro-optical spacecraft are built at a facility in Sunnyvale CA which was part of the original Lockheed Corporation. The ONYX (LACROSSE) imaging radar satellites are built at a Denver plant that was part of the former Martin Marietta Corp. The final spacecraft under these contracts are expected to be launched by 2002.
Lockheed Martin and Boeing were the only bidders on the NRO's request for proposal, which required three bids: one for the electro-optical satellites, one for the imagine radar satellites and a combined bid for both. The NRO, under pressure from Congress to cap costs, asked the companies for winner-take-all bids to build both imagery systems. Boeing offered substantial savings through use of common spacecraft platforms and infrastructure on the two systems. While Lockheed Martin's proposal used common platforms, it was said to be less innovative, offering less performance at a higher cost. Boeing's proposal was about $1-billion cheaper than that of Lockheed-Martin.
On 03 September 1999 the NRO awarded a contract to the Boeing Company, Seal Beach CA, to develop, provide launch integration and operate the nation's next generation of imagery reconnaissance satellites. This award was the largest and last element of the NRO's Future Imagery Architecture program. The multi-year effort will provide a more capable but less costly means of fulfilling the nation's imagery needs and includes the ability to accommodate commercial products. The contract cost is classified. Satellite development begins in the middle of the next decade. [1]

References

[1] www.fas.org
http://www.fas.org/irp/program/core/fia.htm

Retrieved from "http://www.dappolonia-research.com/invesatwiki/index.php/Future_Imagery_Architecture"

This page has been accessed 746 times. This page was last modified 17:49, 4 November 2006.


Find
Browse
Main Page
Current events
Recent changes
Random page
Help
Edit
Edit this page

This page

Printable version
Context
Page history
What links here
Related changes
My pages
Create an account or log in
Special pages
New pages
File list
Statistics
More...